📍 409/410, Krishnapuri, Malipada, BBSR-751003 ✉ subusahoo.73@gmail.com
☎ Direct / WhatsApp: +91 6363654620
Turnkey Engineering & Equipment Supply

Comprehensive Energy & Electrical Solutions.

From 1 kW residential rooftop solar to 500+ kW industrial power plants, heavy-duty DG generators, authorized KEI cabling, and Supreme thermal water heaters.

Engineered for Maximum Efficiency & Durability

Explore our complete range of clean energy systems, continuous backup power, and industrial-grade electrical supplies.

Residential Rooftop Solar System

1. Residential Rooftop Solar (On-Grid / Hybrid)

Custom-engineered rooftop solar PV installations for independent homes, duplexes, and apartment societies. Converts unused roof space into an active power plant that cuts electricity bills by up to 90%.

  • 1 kW to 10 kW Custom Plant Capacities
  • Direct PM Surya Ghar Subsidy up to ₹78,000
  • Bidirectional Net-Metering with TPCODL/TPNODL
  • 25-Year Linear Power Output Warranty
Capacities: 1 kW – 10 kW • Monocrystalline Half-Cut Panels
Commercial Industrial Solar EPC

2. Commercial & Industrial (C&I) Solar EPC

High-yield rooftop and ground-mounted captive solar installations for manufacturing factories, hospitals, IT parks, cold storages, and universities to reduce peak daytime tariff costs.

  • 10 kW to 500+ kW Industrial Scale Systems
  • 40% Accelerated Tax Depreciation Benefits
  • High-Voltage HT Inverters with Remote SCADA Telemetry
  • Fast Payback Period of 3 to 4 Years
Capacities: 10 kW – 500+ kW • CAPEX & OPEX Models
Industrial DG Power Generator

3. Industrial DG Sets (Diesel Generators)

Heavy-duty power generation sets ensuring zero downtime for mission-critical operations such as hospitals, data centers, high-rise buildings, and processing factories.

  • 15 kVA to 500+ kVA Diesel Generators
  • CPCB-II / CPCB-IV+ Compliant Silent Acoustic Canopies
  • Automatic Mains Failure (AMF) Changeover Panels
  • Preventive Annual Maintenance Contracts (AMC)
Capacities: 15 kVA – 500 kVA • 100% Copper Alternator
KEI Industrial Wires and Cables

4. Authorized KEI Wires & Cables Distribution

Official distribution of heavy-duty industrial wiring and high-tension cabling engineered for safe power transmission, zero voltage drops, and fire protection.

  • Extra High Voltage (EHV) & High Tension (HT) Cables
  • Low Tension (LT) Armored & Unarmored Power Cables
  • Zero-Halogen Fire-Survival (FS) Industrial Cables
  • UV-Resistant TUV-Certified Solar DC Cables (4/6 sq.mm)
Full Range: EHV, HT, LT, Armored & Solar DC Cabling
Supreme Solar Water Heater

5. Supreme Solar Thermal Water Heating

High-efficiency solar water heating systems utilizing glass-lined inner tanks and evacuated tube technology for domestic and commercial bulk hot water needs.

  • 100 LPD to 5000+ LPD Capacity Installations
  • Evacuated Tube Collector (ETC) & Flat Plate (FPC) Systems
  • Rust-Proof Glass-Lined Tanks for Hard Water Areas
  • Saves up to 70% electricity compared to electric geysers
Capacities: 100 LPD – 5000 LPD • Glass-Lined Ceramic Tank
Solar Agriculture Pump and Street Lights

6. Solar Agriculture Pumps & Street Lighting

Off-grid solar irrigation solutions and standalone solar street lighting systems engineered for rural farms, highways, and residential layouts.

  • 3 HP to 10 HP Solar Submersible & Surface Pumps
  • PM-KUSUM Scheme Approved Installation Standards
  • Dusk-to-Dawn Auto-Sensor Solar LED Street Lights
  • Integrated Lithium Ferro-Phosphate (LiFePO4) Battery Kits
Pumps: 3HP – 10HP • Lights: 12W – 120W High-Mast LED

Our 6-Step Turnkey Project Workflow

From initial site audit to final DISCOM net-meter grid synchronization and subsidy disbursement.

Step 1: Site Audit

Comprehensive rooftop 3D shadow analysis, structural load testing, and electricity bill audit.

Step 2: Engineering Design

Optimized string design, shadow-free module layout, and electrical single-line diagram (SLD) creation.

Step 3: DISCOM Approval

End-to-end liaisoning with TPCODL, TPNODL, TPSODL, or TPWODL for net-metering feasibility clearance.

Step 4: Installation

Galvanized steel structure erection, Tier-1 module mounting, and KEI DC/AC cabling with lightning arrestors.

Step 5: Meter Testing

DISCOM meter testing, bi-directional net-meter synchronization, and official grid commissioning.

Step 6: Subsidy & AMC

Direct benefit transfer (DBT) subsidy disbursement processing and 25-year performance monitoring.